Carpool to Mt. Hutt

Date Leaving Saturday, August 24
Date Returning Saturday, August 24
Spaces Wanted 1 (looking for a lift)
Name Barbara Eisele
Driven here before no
E-mail Log in or sign up to email Barbara Eisele
Telephone Old data not shown
City you are leaving from Christchurch
Notes

I can meet anywhere, I have my skis +gear too.

Mt Hutt Snow Report
Status Open
Road Open
Road info Road closed to uphill traffic (from the give way signs) at 1pm, Road on hold to downhill traffic (from all carpark exits) at 1.15pm. Road will re-open around between 3 and 3.30pm for downhill traffic only. Chains only need to be carried today. Drive with care and keep to the left at all times maintain 2-way access and observe the 40km/h speed limit. Snowmaking car park will be closed for general public and open for P2P competitors.
Snow 150cm — 225cm
Updated 2019-09-21 at 08:34
Reports thanks to Snownz